Earned Value Management "Cheat Sheet"

A version of this is table included in the student workbook, but this is one page (front and back) listing of all the Earned Value Management indicators (CPI, SPI, ETC, SV, AC, etc.), how they are calculated and how to interrupt the values. The compressed (.zip) file below contains this "Cheat Sheet" in Apple Pages and .pdf formats, as well as a version that can be filled in by students.

EVMSheet.zip (81 downloads)

Sign Up To Learn About New Resources

The Free-Range Technologist is my monthly list of resources, book reviews, lifehacks, and life lessons
Past Issues

Enjoy this Information?

Here are two more things you might like:

  1. YouTube channel: I post lots of technology talks and useful videos for teaching technology. Subscribe here.
  2. Speaking: Hire me to speak or lead a workshop about Blockchain, Smart Everything and the Internet of Things (IoT), or project management. 
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram